Navigation Square, Block A, M&E

Description:

The Project scope consists of a new build shell and core development for O’Callaghan Properties. Dolcain Engineering had overall responsibility for the Mechanical and Electrical Installation on this project. The building was 7 stories, constructed over two basement levels carparks. There were plant rooms located at both roof and basement levels.

Scope of work:

Supply and install of Ventilation Systems, Heating System, Mains Water System, Domestic Hot & Cold Water System, Fire Safety System and Gas Services. Also including above Ground Soils and Waste, Rain Water Harvesting, Commissioning, performance testing, preparation of record drawings, and maintenance manuals .

Fully coordinated working drawings and site coordination and installation of the ductwork & pipework system . Developing tender stage design from current Development Design status to full Detailed Design Status . Design Development associated with acoustic and vibration performance.